CAT / Greyhound Downtown Intermodal Transit Station - This project for Chatham Area Transit / Chatham County included the renovation of the existing Greyhound Station and the complete re-development of the site.  The civil sitework included all new utilities for water, sewer and storm, paving, sidewalks, a new 14 bay covered CAT bus platform, 4 covered Grayhound bus bays, a trolley platform, and landscaping/gardens.  CCS provided water and sewer utility design and construction management services.
Click to add image
Hesse K-8 School - This project for the Savannah Chatham County Public School System involved the demolition of the existing school and the construction of a new 145,500 SF school facility with gymnasium, athletic field, parking lot, sidewalks, and stormwater detention.  The new school was built while keeping the existing school in place and transitioning the students within the same site.  CCS provided civil site design and construction management services.
Click to add image
Click to add image
Coffee Bluff Marina - This project for the City of Savannah consisted of demolition of an existing building, boat hoist, dock and floating boat slips, and the construction of a new building, boat hoist, bulkhead, dock, boat slips, fishing pier, parking lot, and playground.  The parking area utitlized asphalt paving and gravel in order to help with stormwater infiltration.  CCS provided construction management services.
Savannah Gardens - This project for the City of Savannah consisted of demolition of an existing housing complex and rebuilding a new multi-use development with single family homes, apartments, playgrounds, parks, and a splash fountain.  The multi-phase project included new water mains, sewer mains, storm system, sidewalks, curb and gutter,and  gravel/paver/asphalt streets.  CCS provided construction management services for this project.
Click to add image
Windsor Forest Gymnasium - This project for the Savannah Chatham County Public School System involved the construction of a new 28,000+ SF gymnasium with weight room and concession area.  This facility required new water and sewer connections and additional stormwater detention.  CCS provided the water and sewer design and construction management services.
Click to add image
Beach High School - This project for the Savannah Chatham County Public School System involved the construction of a new 1000 Student High School with gymnasium.  This project also consisted of demolition of the existing school and an adjacent elementary school facility while preserving an existing gymnasium and media center.  This facility required new water and sewer utilities, parking lot, sidewalks, and athletic fields.  CCS provided the water and sewer design and construction management services.
Click to add image
Dredging Inspection IDIQ Contract, Mobile, AL - This contract with the U.S. Army Corps of Engineeers consists of a 5 year indefinite delivery, indefinite quantity, task order based contract for the Mobile District.  CCS has held this contract for 3 consecutive terms.  CCS provides field inspectors for dredging, disposal areas, dykes, levees, and other marine construction.
Click to add image
Dredging Inspection IDIQ Contract, Savannah/Brunswick - This contract with the U.S. Army Corps of Engineeers consisted of a 3 year indefinite delivery, indefinite quantity, task order based contract for the Savannah District.   CCS provided field inspectors for dredging, disposal areas, dykes, levees, and other marine construction.
Click to add image
Construction Engineering Inspection, Districts 3 and 7 - These 3 year contracts with the Georgia Department of Transportation consisted providing field inspectors for roadway, bridge, culvert, and utility construction in the South Metro Atlanta and Columbus, GA areas.  CCS inspectors provided quality control, assisted with measurement and payment for construction items, and also helped with traffic control/safety.
Click to add image
Godley Station K-8 School - This project for the Savannah Chatham County Public School System involved the construction of a new 1200 Student K-8 School with gymnasium.  This project consisted of a 52 acre site which housed the 140,000+ SF school, baseball field, softball field, football/soccer field, parking lots, playgrounds, and stormwater detention ponds.   CCS provided the water and sewer design and construction management services.
Click to add image
Crossroads Force Main Extension - This project for the City of Savannah involved the construction of approximately 6,800 LF of 20" force main pipe.  Approximately 1000 LF of this pipe was placed in a wetland area via directional bore using fusible PVC pipe.  The project also consisted of upgrades to an existing lift station and several new valve assemblies.  CCS provided construction management services.